whenever a factory shuts down in one |
3.04 |
Jump to 11.04 |
|
|
covert 19 has compounded that problem |
4.64 |
Jump to 19.76 |
|
|
popping up more than one percent after |
4.48 |
Jump to 57.52 |
PERCENT
more than one percent
|
|
20 billion dollars into a chip making |
5.119 |
Jump to 62.0 |
|
|
gelsinger we're talking about two |
5.12 |
Jump to 82.4 |
|
|
factories in ohio two already reported |
4.879 |
Jump to 84.56 |
|
|
well yeah this is a 20 billion dollars |
3.84 |
Jump to 91.84 |
|
|
on two different factories as you said |
3.68 |
Jump to 93.84 |
|
|
uh there's two other factories in |
3.68 |
Jump to 95.68 |
|
|
until 2025. so this chip shortage |
6.0 |
Jump to 139.52 |
|
|
it's because one as i said this factory |
5.44 |
Jump to 172.56 |
|
|
will not be built until 2025 uh where |
4.56 |
Jump to 175.28 |
|
|
won't even be ready by 2025 because |
4.0 |
Jump to 186.64 |
|
|
six months to build a processor that's |
6.561 |
Jump to 214.879 |
|
|
six months for one wafer so really these |
6.16 |
Jump to 217.92 |
|
|
this is not a two-year plan we're |
4.88 |
Jump to 280.0 |
|
|
talking about a 10-year 20-year plan to |
5.44 |
Jump to 282.16 |
|
|