Text | duration | start | ents | sentiment |
---|---|---|---|---|
complaint to authorities back in 2019 | 6.32 | Jump to 47.68 |
|
|
hired at circuit city in 2016 before the | 6.32 | Jump to 80.4 |
|
|
it was actually going back to 2017 | 5.12 | Jump to 99.52 |
|
|
complaint jointly in april of 2019 | 5.761 | Jump to 113.759 |
|
|
you made a very good point first and | 4.479 | Jump to 154.48 |
|
|
including to go shopping again so first | 4.321 | Jump to 168.239 |
|
|
so as robert explained in 2017 in | 4.32 | Jump to 176.4 |
|
|
third-party engineering reports | 5.199 | Jump to 189.04 |
|
|
problem well before 2017. | 4.121 | Jump to 194.239 |
|
|
solar panels so was this one type in | 4.64 | Jump to 235.519 |
|
|
from 2015 all the way through late 2018. | 5.361 | Jump to 256.639 |
|